One Contract.
One Partner.
Full Accountability.
One integrated EPC model. One accountable partner from design to commissioning.
Lease Space
One Contract.
One Partner. Full Accountability.
One integrated EPC model. One accountable partner from design to commissioning.
Lease Space
THE EPC MODEL

From engineering to commissioning — managed as one project

An integrated EPC contract brings design, procurement, construction and commissioning under one delivery responsibility, reducing interfaces between parties and giving the client a single point of accountability.

ENGINEERING

Design development, technical coordination and project planning.
PROCUREMENT
Sourcing, specification control, supplier coordination and delivery management.
CONSTRUCTION
Site execution, quality control, HSE and construction management.
COMMISSIONING
Testing, systems integration and operational readiness.
HANDOVER
Documentation, completion and transition to operations.
SINGLE ACCOUNTABILITY

One accountable partner across the entire delivery chain

One EPC structure connects the decisions, people and processes that determine project delivery.
One point of responsibility
Greystar owns the interfaces between engineering, procurement, construction and commissioning.
One integrated programme
Design, procurement and construction are sequenced as one programme, keeping critical dependencies aligned.
One delivery objective
Every discipline works toward one outcome: a completed, operational asset delivered to agreed requirements.
Industrial projects become expensive
when responsibility is fragmented
When design, procurement and construction are managed by separate parties, interfaces multiply, decisions slow down and accountability becomes harder to define.
FEWER INTERFACES
Fewer handovers between design, procurement and construction.

FASTER DECISIONS
Critical decisions stay within one accountable delivery structure.

CLEARER LIABILITY
Responsibilities, dependencies and risks are defined within one contract.
Single EPC Contract. Controlled Risk.
We protect client capital through fixed pricing, defined milestones and clear liability allocation — managing commercial, technical and delivery risk within one accountable structure.
FIXED COMMERCIAL FRAMEWORK
Clear pricing structure and defined contractual responsibilities from the outset.
MILESTONE CONTROL
Engineering, procurement and construction aligned around critical milestones and dependencies.
LIABILITY ALLOCATION
Responsibilities and interfaces clearly defined within one accountable contract.
PROCUREMENT CONTROL
Critical suppliers, specifications, lead times and deliveries managed as part of the overall programme.
DELIVERY VISIBILITY
Progress, risks and key decisions remain visible throughout project execution.
FIDIC
Internationally recognised contractual frameworks for complex EPC and turnkey delivery.
ACTA, NON VERBA  >  ACTA, NON VERBA  >  ACTA, NON VERBA  >  
CONSTRUCTION EXECUTION

Execution is where the EPC model is tested

Greystar manages construction through coordinated site operations, quality control, safety procedures and programme management — keeping engineering intent connected to physical delivery.
  • Site Management
    Coordinated construction activities, subcontractors, logistics and site interfaces.
  • Quality
    Inspection, testing and quality-control procedures throughout construction.
  • HSE
    Health, safety and environmental requirements integrated into daily site operations.
  • Programme Control
    Construction progress monitored against milestones, dependencies and completion requirements.
COMMISSIONING

A project is not complete when construction stops

Commissioning brings systems, equipment and project requirements together before handover — preparing the completed asset for its intended operation.
  • Testing
    Systems and equipment tested against approved technical and operational requirements.
    01
  • Verification
    Performance verified through inspection, testing and coordinated systems checks.
    02
  • Completion
    Outstanding works, documentation and quality requirements completed before final handover.
    03
  • Handover
    The completed asset transferred with final documentation and operational readiness confirmed.
    04

Tell us what you need to deliver

Share your project scope, requirements or current design status.

Our team will assess the delivery model and discuss the next steps.

Project control: certainty is engineered before construction begins
Cost, schedule and quality are not managed as separate objectives. They are interconnected throughout the EPC delivery process, with risks identified and addressed before they become problems on site.
  • Cost

    Early procurement and commercial control to maintain alignment with the approved project budget.

  • Timing

    Engineering, procurement and construction activities coordinated around critical milestones.

  • Quality

    Defined technical requirements, inspection procedures and quality assurance throughout delivery.

  • Risk

    Project interfaces, dependencies and delivery risks identified and managed within one accountable structure.

STANDARDS & GOVERNANCE

Built to recognised international standards

Greystar combines international contractual frameworks, engineering standards, quality systems and site controls to maintain consistency across complex project delivery.
  • FIDIC
    Contractual framework for EPC / turnkey delivery.
  • European Standards
    Engineering and technical requirements.
  • HSE
    Health, safety and environmental controls.
  • QA / QC
    Quality assurance and quality control.
  • ESG
    Sustainability requirements integrated into project delivery.
ESG INTEGRATION
Sustainability is engineered into the delivery model.
Environmental requirements are integrated into design, procurement, construction and commissioning — so ESG performance is built into the asset rather than added after delivery.
INDUSTRIAL & LOGISTICS

Built around the demands of modern industry

Greystar focuses on complex industrial and logistics assets where engineering integration, construction quality and operational requirements must work together from day one.
HOW WE ENGAGE

From project brief to an agreed delivery strategy

Whether we enter at concept stage or with an established design, Greystar structures the engagement around the project’s requirements, maturity and risk profile.
  • PROJECT BRIEF >
    Initial requirements and objectives.
  • PROJECT REVIEW >
    Scope, constraints, technical and commercial context.
  • DELIVERY STRATEGY >
    EPC structure, responsibilities and project route.
  • COMMERCIAL FRAMEWORK >
    Scope, programme and contractual basis.
  • EPC CONTRACT
    One accountable delivery structure.

Experience measured in projects
delivered — not promises made

Greystar delivered the Korzinka Distribution Centre as an integrated industrial project, combining engineering, procurement and construction with complex logistics, operational and ESG requirements.

  • 49'684

    M² TOTAL BUILT AREA

  • 10 Ha

    TOTAL DEVELOPMENT SITE

  • 145

    LOADING & UNLOADING DOCKS

  • EDGE A

    ADVANCED CERTIFICATION

KORZINKA DISTRIBUTION CENTRE
Officially visited by the President of Uzbekistan as a nationally significant logistics infrastructure project.

Ready to structure your project?

One project. One accountable EPC partner.


Tell us what you are planning — from logistics and manufacturing facilities to complex industrial developments. We can discuss the project scope, delivery model and next steps from concept to commissioning.

GreyStar*
Delivering industrial real estate through one integrated EPC responsibility — combining European engineering standards with predictable execution across Central Asia.
Navigate
EPC Contractor
Tashkent Hub
Company
ESG
News
Contacts
Address
5A Shahrisabz Street, Tashkent, Uzbekistan
All rights reserved © Greystar 2026.
Privacy Policy
Brand Kit
Back to top